NMPA Releases Inspection Guidelines for Independent Software under Medical Device GMP

Time:2026-11-02

The National Medical Products Administration issued on October 30, 2026 the Inspection Guidelines for Independent Software under the Medical Device Production Quality Management Practice (Guo Yao Jian Xie Guan [2026] No. 17).


The revised Medical Device GMP takes effect on November 1, 2026. The new guidelines also take effect on the same date, while the previous On-site Inspection Guidelines for Independent Software under Medical Device GMP (Yao Jian Zong Xie Guan [2020] No. 57) is repealed.


The guidelines are intended to guide drug regulatory authorities in production inspections of independent software registrants and entrusted manufacturers; inspections involving software components may refer to them. Based on the importance of each provision in the QMS and the quality and safety risks caused by noncompliance, the guidelines integrate the Independent Software Appendix with the GMP into inspection items and classify them into critical items (***), major items (**), and general items (*).


There are 203 independent software inspection items in total: 41 critical items, 94 major items, and 68 general items. The items cover quality assurance, organization and personnel, premises and facilities, equipment, document and data management, design and development, procurement and raw material management, verification and validation, production management, quality control and product release, contract manufacturing and outsourcing, sales and after-sales service, and analysis and improvement.


From November 1, 2026, drug regulatory authorities will use the guidelines for result determination in production license audits and post-market supervision inspections of independent software medical devices. Inspection types and result determination follow the Medical Device GMP Inspection Guidelines. For relevant companies, it is advisable to map their QMS, design and development records, and software release and release-review processes against the new guidelines as early as possible.